Completion Phase Diary
HLF Announcement |
|
Waverley steams to Great Yarmouth |
|
Getting Started |
|
Stripping Out |
|
Dismantling Continues |
|
Jeanie Deans Lounge stripped out |
|
Ian McMillan on television! |
|
Waverley to be Lifted |
|
Lifting barge stormbound |
|
Gordon Reid enters low pressure bore |
|
Picture for Bristol Evening Post |
|
On the barge at last! |
|
Waverley up in the air! |
|
Plating under way |
|
More plating |
|
Fabrication of new forward deck house under way |
|
Hull plating and double bottom near completion |
|
The view from across the River |
|
Around the paddler with Guy Frankham |
|
Making and fitting new paddle eyes and new wooden grating |
|
Hull plating nears completion |
|
Riveting and joinery on belting and landing platform grid under
way |
|
Re-floating Planned |
|
Final work on the lifting barge |
|
Refloating operation |
|
Waverley is towed up river to George Prior's yard |
|
First WebCam picture |
|
Crankshaft Refurbishment |
|
Around the ship with Andrew Gladwell |
|
Mast, Decking and Crew Accommodation |
|
Masts, Promenade Decking and Riveting |
|
Riveting - The Movie Revised |
|
Forward Deck Shelter Lifted On Board |
|
Press Release Issued |
|
More Pictures from Guy Frankham |
|
Progress Report |
|
First PSPS Visit to George Prior's Shipyard |
|
Wheelhouse lifted back |
|
View across the River |
|
In-situ boring, condenser re-tubing and paddle float construction |
|
In-situ boring - The Movie |
|
Main Engine Crankshaft Reinstated |
|
Inspection of refurbished valves |
|
Progress Report |
|
Sea Trials |
|
Finishing Touches |
|
Farewell to Great Yarmouth |
|
Douglas (the man who "bought" the WAVERLEY for the
historic £1 from Caledonian MacBrayne in 1974)
McGowan issues Press Release |
|
The voyage north-about |